Pilot design
Posted: Thu Feb 23, 2017 6:04 pm
HI,
I am a new user of the NGENE software and was hoping for some input after reading the manual and going through the posts in this forum. I am going to conduct a DCE - an efficient design based on a pilot for which I will obtain estimated. The DCE will be distributed to 2000 respondents, and we expect a response rate of min. 50%. The topic is screening - preferences. I have two screening programmes A and B. The attributes and levels are equal across the two alternatives. The pilot study will be an orthogonal design and I tried to design it according to the manual and previous comments in this forum. Will this design be ok for such pre-study? I may need to look at heterogeneity in the final study (e.g. socio economic status and levels of health literacy). This is my syntax:
?Attributes
?do (1,5,20)(number of life saved when screening 1000)
?us (1,2,3) (three different examinations: blood pressure, CT scan and blood test)
?tid (10, 1, 2) (10 minutes, 1 hour and 2 hours)
?fort (5, 25, 50) (numbers that regret screening out of 1000 screened)
?unod (5, 25, 50) (numbers receiving unnessecary treatment out of 1000 screened)
Design
;alts = alt1, alt2
;rows = 12
;orth=seq
;eff = (mnl, d)
;model:
U(alt1) = b1 + b2 * do[1,5,20] + b3 * us[0,1,2] + b4 * tid[10,1,2] + b5 * fort[5,25,50] + b6 * unod[5,25,50] /
U(alt2) = b2 * do + b3 * us + b4 * tid + b5 * fort + b6 * unod $
* Do I need the bi coefficient in the U(alt1)?
This was the outoout I got:
Warning: Defaulting to prior values of zero for the following priors: 'b2, b3, b4, b5, b6'
[OrthogSwapInvert] Design found
Finished, at 10:32:48 PM, 2/22/2017
MNL efficiency measures:
D-error: 0.004313
A-error: 0.040263
B estimate: 100
S estimate: 0
Prior b2 b3 b4 b5 b6
Fixed prior value 0 0 0 0 0
SP estimates Undefined Undefined Undefined Undefined Undefined
Sp t-ratios 0 0 0 0 0
Design
Choice situation alt1.do alt1.us alt1.tid alt1.fort alt1.unod alt2.do alt2.us alt2.tid alt2.fort alt2.unod
1 5 1 1 50 5 1 0 2 25 5
2 20 1 2 5 50 5 2 1 50 25
3 1 2 2 25 50 5 0 1 50 25
4 1 2 10 5 25 20 0 10 25 50
5 1 0 2 25 5 5 1 1 50 50
6 20 2 10 25 5 1 0 10 5 25
7 5 1 1 50 50 20 1 2 5 50
8 5 2 1 50 25 20 2 10 25 5
9 20 1 2 5 5 5 1 1 50 5
10 1 0 10 5 25 20 1 2 5 5
11 20 0 10 25 50 1 2 2 25 50
12 5 0 1 50 25 1 2 10 5 25
Thank you in advance.
Tina
I am a new user of the NGENE software and was hoping for some input after reading the manual and going through the posts in this forum. I am going to conduct a DCE - an efficient design based on a pilot for which I will obtain estimated. The DCE will be distributed to 2000 respondents, and we expect a response rate of min. 50%. The topic is screening - preferences. I have two screening programmes A and B. The attributes and levels are equal across the two alternatives. The pilot study will be an orthogonal design and I tried to design it according to the manual and previous comments in this forum. Will this design be ok for such pre-study? I may need to look at heterogeneity in the final study (e.g. socio economic status and levels of health literacy). This is my syntax:
?Attributes
?do (1,5,20)(number of life saved when screening 1000)
?us (1,2,3) (three different examinations: blood pressure, CT scan and blood test)
?tid (10, 1, 2) (10 minutes, 1 hour and 2 hours)
?fort (5, 25, 50) (numbers that regret screening out of 1000 screened)
?unod (5, 25, 50) (numbers receiving unnessecary treatment out of 1000 screened)
Design
;alts = alt1, alt2
;rows = 12
;orth=seq
;eff = (mnl, d)
;model:
U(alt1) = b1 + b2 * do[1,5,20] + b3 * us[0,1,2] + b4 * tid[10,1,2] + b5 * fort[5,25,50] + b6 * unod[5,25,50] /
U(alt2) = b2 * do + b3 * us + b4 * tid + b5 * fort + b6 * unod $
* Do I need the bi coefficient in the U(alt1)?
This was the outoout I got:
Warning: Defaulting to prior values of zero for the following priors: 'b2, b3, b4, b5, b6'
[OrthogSwapInvert] Design found
Finished, at 10:32:48 PM, 2/22/2017
MNL efficiency measures:
D-error: 0.004313
A-error: 0.040263
B estimate: 100
S estimate: 0
Prior b2 b3 b4 b5 b6
Fixed prior value 0 0 0 0 0
SP estimates Undefined Undefined Undefined Undefined Undefined
Sp t-ratios 0 0 0 0 0
Design
Choice situation alt1.do alt1.us alt1.tid alt1.fort alt1.unod alt2.do alt2.us alt2.tid alt2.fort alt2.unod
1 5 1 1 50 5 1 0 2 25 5
2 20 1 2 5 50 5 2 1 50 25
3 1 2 2 25 50 5 0 1 50 25
4 1 2 10 5 25 20 0 10 25 50
5 1 0 2 25 5 5 1 1 50 50
6 20 2 10 25 5 1 0 10 5 25
7 5 1 1 50 50 20 1 2 5 50
8 5 2 1 50 25 20 2 10 25 5
9 20 1 2 5 5 5 1 1 50 5
10 1 0 10 5 25 20 1 2 5 5
11 20 0 10 25 50 1 2 2 25 50
12 5 0 1 50 25 1 2 10 5 25
Thank you in advance.
Tina