This is an odd question.
Is there away to specify a fixed subset of sets within a design, and then use Ngene to find optimal additional sets to add.
For example, assume 8 sets are pre-specified (from an efficient design of 8 sets).
I want an efficient 12 set design, where 8 of the sets must come from the initial design, that is, I want to find the best 4 additional sets to add.
Is there a way to do this - I've not spotted one in the manual.
(I appreciate that ideally one would just generate a 12 set design!)
thanks
Dan